Documentation deadlines, cargo gate-in windows, and VGM submission timelines. Ensure your shipment makes the vessel.
Operational Deadlines
Critical Timelines
Every port and terminal has its own operational deadlines. TMC aligns with terminal operations and customs requirements to define clear cut-off times per port, vessel, and service.
- ■ Export Stack Cut-Off
- ■ Documentation Deadline
- ■ VGM Submission Window
Snapshot
Gate-In • Docs • VGM
Aligned per Terminal
Cut-Off Definitions
Protecting vessel integrity, customs compliance, and terminal operations.
Gate-In (CY)
Latest time by which export containers must be physically gated into the terminal or designated container yard before vessel loading.
Documentation
Deadline for submitting final shipping instructions, customs details, and mandatory documents to avoid delays or roll-overs.
VGM & Special
Latest time for Verified Gross Mass (VGM), Dangerous Goods approvals, and special cargo clearances.
Indicative Cut-Off Windows
*Actual cut-offs vary by port and service. Always check live schedules.
| Flow / Cargo Type | Gate-In (CY) Cut-Off | Doc Cut-Off | VGM / Special Cut-Off |
|---|---|---|---|
| Standard Dry FCL | 24–48 hours before ETD | 24 hours before ETD | Same as CY |
| Reefer Export | 24–48 hours before ETD | 24 hours before ETD | Before Plug-In |
| Dangerous Goods | 24–48 hours (Post-Approval) | 48–72 hours before ETD | 48+ hours before ETD |
| OOG / Project | Early Gate-In Required | 48 hours before ETD | Per Stowage Plan |
TMC Management
Cut-offs are aligned with terminal operations, customs windows, and vessel planning.
Coordination
Sync with terminal operators for stack opening/closing.
Integration
Data feed from port community systems.
Alignment
Matches customs and regulatory filing deadlines.