Documentation deadlines, cargo gate-in windows, and VGM submission timelines. Ensure your shipment makes the vessel.

Operational Deadlines

Critical Timelines

Every port and terminal has its own operational deadlines. TMC aligns with terminal operations and customs requirements to define clear cut-off times per port, vessel, and service.

  • Export Stack Cut-Off
  • Documentation Deadline
  • VGM Submission Window

Snapshot

Gate-In • Docs • VGM
Aligned per Terminal

Cut-Off Definitions

Protecting vessel integrity, customs compliance, and terminal operations.

Gate-In (CY)

Latest time by which export containers must be physically gated into the terminal or designated container yard before vessel loading.

Documentation

Deadline for submitting final shipping instructions, customs details, and mandatory documents to avoid delays or roll-overs.

VGM & Special

Latest time for Verified Gross Mass (VGM), Dangerous Goods approvals, and special cargo clearances.

Indicative Cut-Off Windows

*Actual cut-offs vary by port and service. Always check live schedules.

Flow / Cargo Type Gate-In (CY) Cut-Off Doc Cut-Off VGM / Special Cut-Off
Standard Dry FCL 24–48 hours before ETD 24 hours before ETD Same as CY
Reefer Export 24–48 hours before ETD 24 hours before ETD Before Plug-In
Dangerous Goods 24–48 hours (Post-Approval) 48–72 hours before ETD 48+ hours before ETD
OOG / Project Early Gate-In Required 48 hours before ETD Per Stowage Plan

TMC Management

Cut-offs are aligned with terminal operations, customs windows, and vessel planning.

Coordination

Sync with terminal operators for stack opening/closing.

Integration

Data feed from port community systems.

Alignment

Matches customs and regulatory filing deadlines.